- Automatic Soldering Machine
- Automatic Screw-driving Machine
- Automatic Dispensing Machine
- Other Intelligent Production Lines
Free Service Hotline:
In the incremental market, in the future, as the PV power generation technology continues to be updated and iterative, PV power generation is expected to realize further penetration in the field of oxygen production, 5G communication, construction, etc., PV inverter will benefit from the expansion of the PV market scale and further growth.
In the incremental market, in the future, as the PV power generation technology continues to be updated and iterative, PV power generation is expected to realize further penetration in the field of oxygen production, 5G communication, construction, etc., PV inverter will benefit from the expansion of the PV market scale and further growth.
In the stock market, due to the core IGBT parts in PV inverters have a life of 10-15 years, initially with a 10-year parts life expectancy, the life of PV inverters installed during 2012-2017 is about to expire in 2022-2027, and the stock replacement market of PV inverters also has a greater potential for development.
Based on the above analysis, preliminary estimates by 2027 China's PV inverter industry overall market demand scale of nearly 20 billion yuan.
Photovoltaic Inverter
Photovoltaic inverters include grid-connected photovoltaic inverters and energy storage inverters.
PV inverter automatic assembly and testing production line, the whole project is divided into three areas, including assembly area, testing area and packaging area. Daily capacity of single line: 3min/pc.
The key technologies of PV inverter automatic assembly and testing production line: 1) automated conveyor line; 2) robots with vision automatic gripping; 3) automatic packaging and palletizing.
The inverter assembly area contains 14 manual assembly stations and 2 non-word testing stations.
The line body is up and down two layers of speed doubling chain, lifting machine at both ends of the line body, and truss clamping mechanism at the end of the line body.
(2) PV inverter aging test area
There are 80 sets of aging test stations and 2 sets of post-test stations. The test area contains three major parts: pre-test, aging test and post-test.
There are 4 sets of pre-testing stations, 1 operator before the area, and 1 wire removal employee after the test.
Automatic Tunnel Furnace
Production Line for Battery Recycling and Discharge Inspection
Blue Laser Soldering Machine
Production Line of Steel Speed Chain
Automatic Core Shelling Machine
Laser Solder Ball Welding Machine with Dual Stations
Laser Soldering Workstation for Automatic Production Line of Air Conditioner Motors
Automatic Assembly Line for Transformers
Automatic Production Line for Water Heater
Multi-layer Automatic Line for Aging Room
Automatic Glazing Line With Manipulator
圆柱电池激光切卷一体机
LED aging room for lighting fixtures
Bucket Elevator
Automatic Assembly Line for Refrigerator